My job is essentially over. For the director, opening night is the closing of the work.
I still have a few things to do- in this particular production, I am giving a curtain speech to set up the audience- but in the main, what I can do, I have done.
And there is still so much more being done.
I am reminded, as I watch the emails fly back and forth among the cast and crew, of what a truly collaborative art theater is.
There are those coming early to set up tech, coming a bit later to set up concessions, others are bringing long staplers to put the programs together.
Some are bringing signs; some are bringing repaired props or costumes.
We are just a few hours from opening.
From theater magic!
Thursday, August 4, 2011
Wednesday, August 3, 2011
Hell week- the ultimate rehearsal
Yesterday, of course, was the *penultimate* rehearsal(s). The first half of my 12 hour day was sweltering, like a sauna- or more like a steam bath.
Progress, definite progress. I now have a sound track I can live with, and most problems are addressed. There are always the last minute items- shortening a skirt, finding some black socks, one last improvement to props- but the tech end is just about in place.
Except for lights. We aren't sure about lights.
Because the SECOND half of my 12 hour day? It rained. I huddled under an umbrella, sitting in the shower, in essence, taking my notes.
Tonight- the ultimate rehearsal(s)! And tomorrow- opening night! The end- the reward- for all the work.
I think the most essential ingredient of all in theater is: the audience.
Progress, definite progress. I now have a sound track I can live with, and most problems are addressed. There are always the last minute items- shortening a skirt, finding some black socks, one last improvement to props- but the tech end is just about in place.
Except for lights. We aren't sure about lights.
Because the SECOND half of my 12 hour day? It rained. I huddled under an umbrella, sitting in the shower, in essence, taking my notes.
Tonight- the ultimate rehearsal(s)! And tomorrow- opening night! The end- the reward- for all the work.
I think the most essential ingredient of all in theater is: the audience.
Tuesday, August 2, 2011
lonely
Sometimes I feel so lonely. Everyone has their own friend or friends, to chat with and sit with, for company, conversation, companionship.
I used to have that.
I wonder when that changed? I know some of the why: my age-mates/stage-mates have moved on to other things.
Still, I am lonely.
I used to have that.
I wonder when that changed? I know some of the why: my age-mates/stage-mates have moved on to other things.
Still, I am lonely.
Hell week- continued...
So day 2- Friday- went much like day 1- It was hot and sticky and so was I and not in a good way.
Saturday I had "off"- although dh K and I had several social engagements and shopping to get through- and we managed.
Sunday - from noon, the hot part of the day, on!- was our set-building marathon.
I have to say, it was pretty awesome. From bare cement to 3 painted façades and several accent/ masking units in 5 hours in the hot sun- amazing.
One of the aspects I love about the set-building day is the camaraderie of all the families working together. We see dads and siblings on set-building day that we haven't met before. Also, everyone is involved. Everyone, especially this time, had something to do: lift something, clean something, cut something, paint something.
It is "many hands make light work" at its finest. It is *satisfying*, too, to see tangible results of your work- unlike many of the other of the director's tasks.
So, that was a long, satisfying day.
Yesterday, Monday, was the first dress rehearsal, and we brought in the sound equipment. We brought in the lighting, too, but didn't have time to deal with that on Monday. Maybe tonight.
There are issues that we discovered with the set that we must address: the enormously wide stage has huge areas that need masking to hide the backstage areas. Everything needs stabilizing due to the wind.
And my sound designer apparently attended entirely different meetings- with me- than I did! Because the sound design is NOT Western at all. The farts I asked for and the chimes I asked for are not there. We will see if it is amended today; if not, it will be a long night tonight or an early morning tomorrow for me - with or without the sound designer.
Oh! And, daily I've been getting sunburns, despite increasingly desperate efforts to stay out of the sun. No worries today, though: it's supposed to rain!
Of course it is!
I'm ready for theatre magic to kick in, whenever...
Saturday I had "off"- although dh K and I had several social engagements and shopping to get through- and we managed.
Sunday - from noon, the hot part of the day, on!- was our set-building marathon.
I have to say, it was pretty awesome. From bare cement to 3 painted façades and several accent/ masking units in 5 hours in the hot sun- amazing.
One of the aspects I love about the set-building day is the camaraderie of all the families working together. We see dads and siblings on set-building day that we haven't met before. Also, everyone is involved. Everyone, especially this time, had something to do: lift something, clean something, cut something, paint something.
It is "many hands make light work" at its finest. It is *satisfying*, too, to see tangible results of your work- unlike many of the other of the director's tasks.
So, that was a long, satisfying day.
Yesterday, Monday, was the first dress rehearsal, and we brought in the sound equipment. We brought in the lighting, too, but didn't have time to deal with that on Monday. Maybe tonight.
There are issues that we discovered with the set that we must address: the enormously wide stage has huge areas that need masking to hide the backstage areas. Everything needs stabilizing due to the wind.
And my sound designer apparently attended entirely different meetings- with me- than I did! Because the sound design is NOT Western at all. The farts I asked for and the chimes I asked for are not there. We will see if it is amended today; if not, it will be a long night tonight or an early morning tomorrow for me - with or without the sound designer.
Oh! And, daily I've been getting sunburns, despite increasingly desperate efforts to stay out of the sun. No worries today, though: it's supposed to rain!
Of course it is!
I'm ready for theatre magic to kick in, whenever...
Friday, July 29, 2011
Hell week: day 1
We open one week from yesterday.
Yesterday was the start of hell week for me.
It's Comedy of Errors- sometimes literally!- Shakespeare in the Park, with teen theater troupe. TWO complete casts: one traditionally cast, one all female- except for Dr. Pinch, who is a guy in drag.
The last week of July. A heat wave.
Yesterday was the first day the actors were not allowed to call for line.
Oh, how I dread that long, painful day in the rehearsal process. Doubly dreadful this time, two run throughs, one for each cast.
And, to add to the delight, a storm.
I arrived at the amphitheater to find the storage rooms had flooded. The cement space in front of the stage (we plan to use it for seating) was flooded- three or more inches deep in places.
Joy.
NOT.
We unloaded additional collected props, set up for rehearsal, pulled out what had been soaked to dry.
I set up my director's chair and opened my notebook- and my umbrella.
And, as predicted, it was awful.
But... I actually laughed out loud - at the *play*- in a few places.
There is hope!
Yesterday was the start of hell week for me.
It's Comedy of Errors- sometimes literally!- Shakespeare in the Park, with teen theater troupe. TWO complete casts: one traditionally cast, one all female- except for Dr. Pinch, who is a guy in drag.
The last week of July. A heat wave.
Yesterday was the first day the actors were not allowed to call for line.
Oh, how I dread that long, painful day in the rehearsal process. Doubly dreadful this time, two run throughs, one for each cast.
And, to add to the delight, a storm.
I arrived at the amphitheater to find the storage rooms had flooded. The cement space in front of the stage (we plan to use it for seating) was flooded- three or more inches deep in places.
Joy.
NOT.
We unloaded additional collected props, set up for rehearsal, pulled out what had been soaked to dry.
I set up my director's chair and opened my notebook- and my umbrella.
And, as predicted, it was awful.
But... I actually laughed out loud - at the *play*- in a few places.
There is hope!
Labels:
comedies,
directing,
rehearsals,
theater disaster,
theater magic
Thursday, July 28, 2011
tech week
I am about to enter hell.
Tech week is called "hell week" by many, many theater folk. It's when in bringing it all together, it all falls apart- and, with luck, prayer, hard work and theater magic, it all comes together.
On Sunday, teens and adult mentors are gathering for a one-day marathon creating our set. The challenge this year is a new bandshell amphitheater - yea!- with a CEMENT FLOOR- boo! Fortunately, our design concept is Western cardboard cut out facade with bright primary colors and Southwestern rose and tan and taupe for neutrals- so it actually fits in with our concept if the audience can see braces and supports.
At least, I will tell everyone that it's an artistic choice!
Monday we bring in the rented lights and the rented microphones. We bring in the costumes and the props. We add the sound track.
Tuesday we add make up and hair.
Wednesday: final dress tech rehearsal. As close to show conditions as possible.
Thursday: OPENING #1!
Friday: OPENING #2!
(Oh, did I forget to mention that on each of those days I am doing everything TWICE? Once for each of two casts?)
Double hell.
Tech week is called "hell week" by many, many theater folk. It's when in bringing it all together, it all falls apart- and, with luck, prayer, hard work and theater magic, it all comes together.
On Sunday, teens and adult mentors are gathering for a one-day marathon creating our set. The challenge this year is a new bandshell amphitheater - yea!- with a CEMENT FLOOR- boo! Fortunately, our design concept is Western cardboard cut out facade with bright primary colors and Southwestern rose and tan and taupe for neutrals- so it actually fits in with our concept if the audience can see braces and supports.
At least, I will tell everyone that it's an artistic choice!
Monday we bring in the rented lights and the rented microphones. We bring in the costumes and the props. We add the sound track.
Tuesday we add make up and hair.
Wednesday: final dress tech rehearsal. As close to show conditions as possible.
Thursday: OPENING #1!
Friday: OPENING #2!
(Oh, did I forget to mention that on each of those days I am doing everything TWICE? Once for each of two casts?)
Double hell.
Labels:
directing,
rehearsals,
theater disaster,
theater magic
Thursday, July 14, 2011
Subscribe to:
Posts (Atom)
